Please note that
SMCMUA does not release bidder information or engineering estimates for current Bids/RFPs.
Information regarding bidders and proposals are exempt from disclosure under OPRA until such time as formal action is taken by the governing body, because
such information, “if disclosed, would give an advantage to competitors or
bidders” [See N.J.S.A. 47:1A-1.1].
Current
-
Langdon Lane Water Main
Replacement: Major items of work include the installation of
approximately 850 linear feet of 8-inch ductile iron pipe and the
installation of associated fire hydrants and copper services as shown on the
Contract Drawings. Click here to view
Notice to Bidders.
-
Janitorial Services:
Contractor is to provide all labor and any additional necessary supplies and
equipment to perform the janitorial services as required and detailed in the
bid specifications. The Authority will provide all cleaning products (i.e.
surface cleaner, furniture polish, glass cleaner, etc.), cleaning equipment
(i.e. mops, buckets, sponges, dust cloths, vacuum with HEPA filters, etc.),
and other products for restocking restrooms and kitchens (i.e. paper towels,
toilet paper, hand soap, air fresheners, garbage bags, etc.). Click
here to view Notice to Bidders.
-
Jones Woods 2MG Tank
Improvements: This work consists of removing tank coating,
application of new coatings on both the interior and exterior of the tank,
installation of a frost proof vent, a tank mixer, new ladder with safety
climb system, new hatches and other tank improvements as shown on the plans
for a 2 million gallon ground level storage tank located in Morris Township,
NJ. Click here to view
Notice to Bidders.
Past
-
Redevelopment of Black
Brook Wells: The work includes the redevelopment of two screened
production wells in Hanover Township, Morris County. This work will be
completed under the supervision of a well driller licensed in the State of
New Jersey. Click here to view
Notice to Bidders.
On June 13, 2024, a contract was awarded to William Stothoff Company.
-
Repair of Jones Woods
Access Drive: This work consists of repairing a washed-out gravel
access road. Work items include removing existing utility poles,
removing an existing tree, regrading, installing geotextiles and geocells
and to install aggregate of various types. The plans are a general
representation of the work required and field determinations will be
required in coordination with the Engineer and the Morris County Soil
Conservation District. Click here to view
Notice to Bidders.
On June 13, 2024, a contract was awarded to T. R. Weniger Inc.
-
Jones Woods Tanks
Electrical Improvements: This work consists of upgrading the
electrical and communications equipment at the Jones Woods Tanks site
located behind the Villa Walsh Academy in the Township of Morris. In
general, the Contractor shall remove electrical equipment from the existing
vault on site, construct a new above ground equipment pad, run new conduit,
install new electric and RTU control panels and replace lighting within the
vaults. Click here to view
Notice to Bidders.
On May 16, 2024, a contract was awarded to Power with Prestige.
-
Liquid Non-Hazardous Waste
Removal: This contract includes the vendor to provide tanker
trucks to be filled with liquid treatment plant waste at the Authority’s
site, and removal of the waste upon notice from the Authority. Liquid waste
shall be transported and disposed in an environmentally safe manner in
accordance with all Federal, State and local laws. Click here to view
Notice
to Bidders. On May 16, 2024, a contract was awarded to Coppola
Services, Inc.
-
Ductile Iron Cement Lined
Pipe: This contract includes the vendor to provide ductile iron water
pipe on a not-to-exceed, as needed basis. Click here to view
Notice to Bidders. On May
16, 2024, a contract was awarded to Capitol Supply Construction Products,
LLC.
-
Groundskeeping: The
contract for facility groundskeeping services will include: turf mowing and
turf edging, tree/hedge trimming and pruning, leaf and branch removal, and
gutter and downspout cleaning for the Authority’s properties with Morris
County. Click here to view
Notice to Bidders. Bids were opened on April 4, 2024. On
April 18, 2024, a contract was awarded to LTI, Inc.
-
Catalog Percentage Discount
Pricing for Water Utility Supplies and Equipment: For this contract,
water utility supplies and equipment includes: Compact Mechanical
Joint Fittings; Copper Tubing; Curb Boxes and Parts; Ductile Iron Water
Pipe; Hydrants; Hydrant Repair Parts, Mechanical Joint Restraints;
Mechanical Joint Valves; Meter Pits; Meter Pit Parts; Repair Clamps; Repair
Couplings; Tapping Sleeves; Tapping Valves; Services Saddles; Valve Boxes
and Parts; and Water Service Materials. For each manufacturer or brand
that a Bidder bids upon, the Bidder must (1) identify the most current Price
List or Catalog upon which the Bid is based, (2) Identify the Price List or
Catalog Date/Number, (3) Propose a Percentage Discount, and (4) Submit with
its bid the price list(s) or catalog(s) being bid upon. Click here to
view Notice
to Bidders. Bids were opened on March 7, 2024. On March 21,
2024, contracts were awarded to Brent Material Company, Ferguson Waterworks
and Raritan Group.
-
Professional Engineering
Services in connection with Headquarters Facility Improvements: The
scope of work includes design of the construction of a materials and
equipment storage building at SMCMUA’s Headquarters Facility located at 19
Saddle Road in Cedar Knolls, New Jersey. Click here to view
Invitation to
Submit Proposal. Proposals were opened on January 18, 2024.
On February 15, 2024, this contract was awarded to EI Associates Architects
and Engineers.
-
Glenbrook Road Water Main
Replacement: Major items of work include installation of approximately
4,500 feet of 8” diameter water main and associated appurtenances on
Glenbrook Road, Bangiola Court and Keenan Place in the Borough of Morris
Plains, NJ. Click here to view Notice
to Bidders. Click here to view
Notice for Addendum No. 1.
Bids were received on December 7, 2023. A contract was awarded to P.M.
Construction at the December 21, 2023 Board Meeting.
-
Upgrades for Manganese Removal
Treatment at Black Brook Water Treatment Plant: Major items of work
include: Replacement of manganese greensand media in six (6) 11-foot
diameter contactors, assessment of manganese Greensand contactors,
installation of a six-inch diameter electrically actuated butterfly valve
and associated piping connections to replace the existing backwash waste
valve, installation of a new 76 cfm rated blower and associated two-inch
diameter piping to connect to the existing air piping, modifications to the
instrumentation and controls and electrical upgrades at the Black Brook
Water Treatment Plant. Click here to view
Notice to
Bidders. Click here to view
Notice for Addendum No. 1.
Bids were received on December 7, 2023. A contract was awarded to
Derstine Company LLC at the December 21, 2023 Board Meeting.
To obtain bid/RFP specifications, submit requests to
abozza@smcmua.org with the following
information:
- Contact Name |
- Company |
- Physical Address |
- City, State and Zip |
- Phone No. |
- Fax No. |
Top
|